ChronoliaTM CONCRETE
ChronoliaTM responds to these two requirements: whereas between 12 and 20 hours are needed before formwork can be removed with conventional concrete, ChronoliaTM becomes resistant in record time and formwork can be removed just four hours after manufacture! With the same workability as a conventional ready-mix concrete, it can be used on all construction sites, as well as to repair road surfaces, which means they can be brought back into service very rapidly. With such a rapid setting time, ChronoliaTM makes it possible to reduce possible disruption caused by construction sites and increase efficiency and productivity. It also means that it is possible to "rethink" the organization of a building site before work begins, in terms of deadlines, cycle times, the use of equipment and costs. CASI, one of the few companies in Colorado to be trained and certified in the installation of ChronoliaTM, is ready to meet your demanding needs. BENEFITS: ► Fast curing ADDITIONAL INFORMATION Concrete can degrade due to similar issues facing asphalt: freeze-thaw deterioration, excessive loading, sub-grade failure and design errors. Concrete is also susceptible to shrinkage. |
||
|---|---|---|---|



Over 5 years of research went into the development of this unique concrete product. ChronoliaTM combines two apparently contradictory features requested by customers: a concrete product that can be transported and handled like conventional fluid concrete, and which, once laid, very rapidly develops high mechanical strength.