Skip to main content
CASI (Colorado Asphalt & Concrete) banner
Striping 1
STRIPING

Striping is the “finishing touch” on a freshly paved or seal coated parking lot. Since striping is the most noticeable part of the parking lot, it is imperative the job is neat as well as efficiently laid out.

BENEFITS:

Property image
► Safety
► Maximum space utilization of lot
► Traffic flow
► ADA compliance

ADDITIONAL INFORMATION

Striping or painting should only be performed when the pavement surface is dry, and clean, and when the outside temperature is above 40 degrees F. It is best to apply paint when the weather conditions are not excessively windy, dusty or foggy.

Striping 2
Striping 3
Striping 4

PROCESS:

  1. Clean area of debris.
  2. Stripe / Stencil
  3. Dry

EZ-STREET logo


CASI Concrete logo
CASI Heart Friendly logo